|
Click to forward to a colleague!
Welcome to the Power Topics e–Newsletter
Cummins Power Generation is the world’s only provider of pre–integrated PowerCommand® commercial power
systems — from standby/emergency systems to multi–megawatt utility peaking facilities to sophisticated
cogeneration applications.
Each issue of the Power Topics e–Newsletter will feature updates on our latest products, whitepapers and
power solutions.
Power topic #7016-1: Transfer switch set up for reliability and efficiency, part 1: Transfer switch operation sequences
By Gary Olson, Director, Power Systems Development
Many facilities that have generator sets (gensets) also have automatic transfer switch equipment (ATS) to
automatically start the generator set on a power failure and automatically switch the load from the utility to the
generator set and back again. To obtain the most reliable and efficient system operation, it’s important to
have the ATS properly set up so that it can sense power failure and operate in the best sequence for the system that
is installed and the equipment it supports. PT–7016, part one, explains how transfer switches operate and
the time sequence of power failure and return. This is the first in a three-part series discussing automatic
transfer switches.
Download the Whitepaper.
Case History: Mass Rapid Transit — Singapore
Cummins Power Generation gensets provide back–up power for the world’s first fully–automated Mass
Rapid Transit (MRT) system. Nearly all of the stations in the MRT’s North East Line in Singapore are backed up by
Cummins Power Generation gensets because of their known reliability in emergency and heavy duty applications.
Read the full story...
Automatic transfer switches — Reliable, flexible and dependable.
PowerCommand® transfer switches
optimize system reliability and
performance, reduce maintenance
costs and enhance your entire
system with unique capabilities. PowerCommand® automatic
transfer switches feature
microprocessor–based control
technology for easy operation and
robust, high–contact–force design to withstand thousands of
switching cycles, ensuring reliable
operation and service.
To learn more about our comprehensive range of transfer switches, please click here.
PowerSuite software update released June 25, 2008
As of Wednesday 6/25/2008 the PowerSuite GenSize program data files have been updated. If you are a user or
our PowerSuite software, and have not done so already, please download the latest update. This will ensure that
your GenSize data is current by adding new and deleting obsolete models.
To download the update click on the link under "Latest Updates" on the Power Suite Web Center page
located at:
Click here for the download page...
|